Liquid-controls MA4 Meter Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Liquid-controls MA4 Meter. Liquid Controls MA4 Meter User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - LPG Motor Fuel Dispensers

Installation & Parts ManualMA-4 Positive Displacement Meter forLPG Motor Fuel Dispensers(Single & Dual Meter Versions)www.lcmeter.comInstalla

Strona 2 - Safety Procedures

10WARNINGRelieving Internal PressureAll internal pressure must be relieved to zero pressurebefore disassembly or inspection of the strainer, air elimi

Strona 3 - How LC Meters Work

11Meter MaintenanceExamine all fasteners. Make sure fasteners are not bent,rusted, or have pulled threads. The threads should allappear evenly placed.

Strona 4 - Owner’s Information Packet

12Pulse Output Device (POD5)The Liquid Controls Pulse Output Device (POD) convertsthe rotary motion of the Positive Displacement Meter intoelectronic

Strona 5 - Operation Requirements

13Pulse Output Device (POD5)Service InformationDue to the simplicity of the POD5, there are few thingsthat can go wrong with the device. However, as

Strona 6 - Installation

14Pulse Output Device (POD5)SpecificationsSPECIFICATIONS:Voltage Supply: ... (V+): 5VDCCurrent Supply: ...

Strona 7

15Vapor Eliminator & Strainer MaintenanceServicing of the vapor eliminator and strainer involvesoccasional cleaning of the strainer, or, when requ

Strona 8

16Vapor Eliminator & Strainer Maintenance5. Inspect the vapor eliminator cover O-Ring and O-Ring groove. The groove in which the O-Ring islocated

Strona 9

17Differential Valve MaintenanceFaulty operation of the differential valve may be causedby defective valve seals, the spring, or the diaphragm.The dia

Strona 10 - Meter Maintenance

18Disassembling the MeterRotor Gear Wrench or SocketBearing Plate Wrench or SocketCounter Bracket Wrench or SocketDrain Plug Allen WrenchCover Socket

Strona 11

19Disassembling the Meter4. Hold a spare displacement rotor gear between theright displacement rotor gear and the blocking rotorgear to keep them from

Strona 12 - Pulse Output Device (POD5)

2Table of ContentsDescription Page NumberSafety Precautions ...2How LC Meters Work ...

Strona 13

20Removing the Non-Corroded Rotor Gears7. If the Gears show signs of corrosion, use thealternative method describe on Page 21, “RemovingCorroded Rotor

Strona 14

21Removing Corroded Rotor Gears1. Replace all three rotor gear screws, without washers,halfway onto each of the rotor ends.2. On the back of the meter

Strona 15 - Disassembling and Assembling

22Reassembling the MeterTools: Cover socket or open end/box end wrenchSpare displacement rotor gearRotor gear wrench or socketBearing Plate wrench or

Strona 16

234. The rotors should have a small amount of end-playand be easy to turn. Test each rotor one at a time.Turn the rotors to make sure that they revolv

Strona 17 - Disassembling the Valve

24Timing the Rotor GearsRotor gears are timed by lining up the timing marks(circled in illustration). The blocking rotor gear has atooth directly in

Strona 18 - Disassembling the Meter

25Torque ChartWrench and Socket Size ChartNOTE: Prior to installation, apply a small amount of Locquic Primer N764 to each screw. Apply a light coat

Strona 19

26Troubleshooting!!!!! WARNINGAll internal pressures must be relieved before disassembly or inspection of the strainer, air eliminator, any valves in

Strona 20

271. Refer to the exploded view drawings on Pages 28-31. Find the four digit item number for the part youwant to order. The item numbers are listed

Strona 21 - Removing Corroded Rotor Gears

28Meter Assembly Exploded View

Strona 22 - Reassembling the Meter

29Strainer Assembly Exploded ViewNOTE:• Assembly shown is for systems that use Electronic Temperature Volume Compensation (ETVC). Systemswithout ETVC

Strona 23

3How LC Meters WorkLiquid Controls meters are positive displacement meters.They are designed for liquid measurement in bothcustody transfer and proces

Strona 24 - Timing the Rotor Gears

30Differential Valve Exploded View

Strona 25 - Wrench and Socket Size Chart

31WARNING:When a Back Check Valve is used, an automatic safetyvalve must be installed to prevent pressure build-up inexcess of rated working pressure

Strona 26 - Troubleshooting

© 2006 Liquid ControlsPub. No. 500218(02/06)A Unit of IDEX Corporation105 Albrecht DriveLake Bluff, IL 60044-22421.800.458.5262 • 847.295.1050Fax: 8

Strona 27

4Owner’s Information PacketIs all your documentation included with your meter? LCmeters come in many variations. The information sent toyou depends o

Strona 28 - Meter Assembly Exploded View

5• The meter must always be securely bolted to aplatform or supporting member, regardless of themounting position of the meter. Never “hang” a metero

Strona 29

6InstallationMounting Dimensions - Single MeterNOTE: Always request up-to-date engineering approved dimensional drawings before starting any construct

Strona 30

7NOTE: Always request up-to-date engineering approved dimensional drawings before starting any construction. Donot rely on catalog pictures or drawing

Strona 31

8InstallationThe Liquid Controls MA-4 LPG Meter combines a positivedisplacement meter, differential valve, strainer, and vaporeliminator in one assemb

Strona 32

9InstallationMeter Start-up and OperationPrior to meter start up, use extreme caution. Make surethat:1. The meter is properly secured2. All connection

Komentarze do niniejszej Instrukcji

Brak uwag